USAID home skip repetitive navigation
USAID in Jordan Mount Nebo - Siyagha. Memorial of Moses.
Intranet Contact Us Site Map
About Jordan About Us Features Press Media Gallery On The Map Business Opportunities FAQs Links
 Overview  |  History  |  Budget  |   Key Documents
 

 May 9, 2008

Quwaysmah - Lower church Sectors
  Economic Growth
  Water Resources Management
  Democracy & Governance
  Education
  Health
  Cash Transfer
  MCC
 
Karak Castle
  The Karak Castle, Karak

 

Home>About Us> Key Documents


About Us - Key Documents

This section contains various USAID publications and key documents. You are more than welcome to download these documents and use them for reference.


General Information

USAID/Jordan Program Overview
USAID/Jordan Achievements: 1951-2004
USAID Support for Aqaba
USAID Support for the Preservation of Petra


Strategy and Policy Documents

USAID/Jordan Strategy: 2007-2011
USAID/Jordan Strategy: 2004-2009
FY2006 Jordan Congressional Budget Justification
FY2005 Annual Report
FY2004 Annual Report


Health and Population

Jordan HIV Profile: 2004
Demographic Transition and Economic Opportunity: The Case of Jordan


Water Resources

Water Resources in Jordan: 2001
Water Resources in Jordan Annexes


Water Efficiency and Public Information for Action (WEPIA) Program

WEPIA Final Report
Assessment of Water Saving Devices (WSDs) Sector
Bashir Hospital Audit
Brochures and Comic Strips Pretesting
A Comparison Between the Exit Study and the Omnibus Survey
Jordanian Building Codes Specifications and Standards Recommendations
KAP with Large Water Users
Mayors Survey in Jordan: Report
Mayors Survey
Overview of All KAP Surveys
Quinn Consultant Trip Report -- Horta-Sorb® Polymers and Water Efficiency
Recommendations to Jordan’s Integrated Approach to Water Efficiency - Tom Chestnut
Sanitary Codes: Car Wash (Arabic)
Sanitary Codes: Greywater Guidelines (Arabic)
Sanitary Codes: Swimming Pools (Arabic)
Sanitary Codes: Water Harvesting (Arabic)
Survey of Home Appliances and Toilets Report
Wales and Purcell Consultant Trip Report - Manufacture of Water Conservation Devices
Water Demand Management Data and Analysis Recommendations for the Water Demand Management Unit - Tim Skeel
Water Demand Management Policy for Jordan - Dr. Dziegielewski
Water Demand Management Preliminary Policy
Water Demand Management Program - Dr. Dziegielewski Trip Report
Water-Conserving Gardens: A User’s Manual - Center for the Study of the Built Environment (CSBE)
Community Grants Program Monotoring & Evaluation
Energy Conservation Manual
Fuheis School Program Study
Future Search Conference For Increasing Water Efficiency By Large Consumers In Jordan
Jordan Radio & Television Station Water Audit
Jordan University Hospital Water Audit
Journalists Guide
Ministry of Awqaf Program Evaluation
Ministry of Awqaf Water Audit
New Tourist Leaflet Pretesting
New Water Saving Devices Name Pretesting
NGO Assessment
NGO Sustainability Program
Supplier Perception Of New Jordanian Vat Tax
TV Spots Pretesting
Water Conservation Guide
WEPIA Quarterly Reports (2000-2004)


Mafraq Design and CMC Services

I. Attachment 1: Geotechnical Investigation Report for Mafraq WWTP Project, July 2003
II. Attachment 2: Mafraq WWTP and Reuse Application - Treated Wastewater Reuse Feasibility and Conceptual Design
III. Attachment 2: Mafraq WWTP and Reuse Application - Environmental Assessment
IV. Attachment 4: Final Conceptual Design Report
All Attachments
Mafraq Amendment No. 1
V. Attachment to Amendment No. 1 -- Mafraq Final Assessment
VI. Attachment to Amendment No. 1 -- Geotechnical Report Figures
VII. Attachment to Amendment No. 1 -- Task 1 Figures
VIII. Attachment to Amendment No. 1 -- Appendices (Part I)
IX. Attachment to Amendment No. 1 -- Appendices (Part II)
X. Attachment to Amendment No. 1 -- Task 3 Figures
XI. Attachment to Amendment No. 1 -- Task 3 EA Appendices
XII. Attachment to Amendment No. 1 -- Concept Design Calculations - Part 1
XIII. Attachment to Amendment No. 1 -- Concept Design Calculations - Part 2


Information Technology Master Plan

Water Sector IT Master Plan Final Report, August 2006: Volume I Part A - Recommendations
Water Sector IT Master Plan Final Report, August 2006: Volume I Part B - Recommendations
Water Sector IT Master Plan Final Report, August 2006: Volume I Part C - Recommendations
Water Sector IT Master Plan Final Report, August 2006: Volume I Annexes 1-7 - Recommendations
Water Sector IT Master Plan Final Report, August 2006: Volume I Annexes 8-12 - Recommendations
Water Sector IT Master Plan Final Report, August 2006: Volume II Part A - Appendices
Water Sector IT Master Plan Final Report, August 2006: Volume II Part B - Appendices
Water Sector IT Master Plan Final Report, August 2006: Volume II Part C - Appendices
Water Sector IT Master Plan Final Report, August 2006: Volume II Part D - Appendices
Water Sector IT Master Plan Final Report, August 2006: Volume II Part E - Appendices
GTZ Water Information System (WIS) Enhancement
MWI Assessment of Needed Licenses


Northern Governorates Water Transmission System

Feasibility Study – Executive Summary
Feasibility Study – Volume I Table of Contents
Feasibility Study – Volume I Section 1
Feasibility Study – Volume I Section 2
Feasibility Study – Volume I Section 3 Part 1
Feasibility Study – Volume I Section 3 Part 2
Feasibility Study – Volume I Section 3 Part 3
Feasibility Study – Volume I Section 4
Feasibility Study – Volume I Section 5
Feasibility Study – Volume I Section 6
Feasibility Study – Volume I Section 7 Part 1
Feasibility Study – Volume I Section 7 Part 2
Feasibility Study – Volume I Section 7 Part 3
Feasibility Study – Volume I Section 7 Part 4
Feasibility Study – Volume I Section 8 Part 1
Feasibility Study – Volume I Section 8 Part 2
Feasibility Study – Volume I Section 8 Part 3
Feasibility Study – Volume I Section 8 Part 4
Feasibility Study – Volume II Table of Contents
Feasibility Study – Volume II – Appendix A
Feasibility Study – Volume II – Appendix B
Feasibility Study – Volume II – Appendices C - F
Feasibility Study – Volume II – Appendix G
Feasibility Study – Volume II – Appendices H-I
Feasibility Study – Volume II – Appendices J-L
Feasibility Study – Volume III (Part 1)
Feasibility Study – Volume III (Part 2)
Feasibility Study – Volume III (Part 3)
Feasibility Study – Volume III (Part 4)
Feasibility Study – Volume III (Part 5)
Feasibility Study – Volume III (Part 6)
Tender Documents – Volume II Part 1
Tender Documents – Volume II Part 2
Bill of Quantities (Draft)
Drawings – General
Drawings – Civil
Drawings – Architectural
Drawings – Structural
Drawings – Mechanical
Drawings – Electrical (Part 1)
Drawings – Electrical (Part 2)
Drawings – Electrical (Part 3)
Drawings – Electrical (Part 4)
Drawings – Pipeline Profile (Part 1 )
Drawings – Pipeline Profile (Part 2 )
Drawings – Pipeline Profile (Part 3 )
Drawings – Pipeline Profile (Part 4)
Drawings – Pipeline Profile (Part 5 )
Drawings – Pipeline Profile (Part 6 )
Drawings – Pipeline Profile (Part 7 )
Drawings – Pipeline Profile (Part 8)
Drawings – Pipeline Profile (Part 9 )
Drawings – Pipeline Profile (Part 10 )
Drawings – Pipeline Profile (Part 11 )
Drawings – Pipeline Profile (Part 12 )
Drawings – Pipeline Profile (Part 13)
Drawings – Pipeline Profile (Part 14)
Drawings – Pipeline Profile (Part 15)
Drawings – Pipeline Profile (Part 16 )
Drawings – Pipeline Profile (Part 17)
Drawings – Pipeline Profile (Part 18 )
Drawings – Pipeline Details


MCC

MCC Jordan Program Profile


Umm Ar - Rasas. Church of Saint StephenSearch
 
  Go
    Last updated on: April 10, 2008   Get Adobe Reader
Mount Nebo - Siyagha. Memorial of Moses

    The U.S. Agency for International Development  |  Privacy and Security

/upload/